
Featuring the Burner• Direct Vent Freestanding Stove• Natural Gas or Propane• Vent Horizontally or Vertically• Standard Residential• Mobile Home Appr
10 Installation (for qualified installers only)Travis Industries 100-01169_001 4050119Gas Line InstallationMASSACHUSETTS INSTALLATIONS - WARNI
Installation (for qualified installers only) 11Travis Industries 100-01169_001 4050119Vent Requirements• The vent must maintain the required 1"
12 Installation (for qualified installers only)Travis Industries 100-01169_001 4050119Approved Vent ConfigurationsRestrictor Position• A restrictor
Installation (for qualified installers only) 13Travis Industries 100-01169_001 4050119Vertical Termination with Zero, Two, or Four 45° Elbows• The t
14 Installation (for qualified installers only)Travis Industries 100-01169_001 4050119Horizontal Termination with One 90° Elbow• If using a Snorkel
Installation (for qualified installers only) 15Travis Industries 100-01169_001 4050119Horizontal Termination with Two Elbows(one 90° vertical and on
16 Installation (for qualified installers only)Travis Industries 100-01169_001 4050119Horizontal Termination with Three 90° Elbows (all vertical)• T
Installation (for qualified installers only) 17Travis Industries 100-01169_001 4050119Vertical Termination with Two 90° Elbows• The termination must
18 Installation (for qualified installers only)Travis Industries 100-01169_001 4050119Vertical Termination with Three 90° Elbows(Two 90° Vertical an
Installation (for qualified installers only) 19Travis Industries 100-01169_001 4050119Vent Termination Requirements (see illustration below)! Ventin
2 IntroductionTravis Industries 100-01169_001 4050119IntroductionWe welcome you as a new owner of an Avalon Tree of Life stove. In purchasing a Tree
20 Installation (for qualified installers only)Travis Industries 100-01169_001 4050119 Class A Chimney Conversion KitSimpson Duravent provides a con
Installation (for qualified installers only) 21Travis Industries 100-01169_001 4050119Masonry Chimney Conversions (Interior or Standard)• Follow the
22Finalizing the Installation (for qualified installers only)Travis Industries 100-01169_001 4050119Finalizing the Installation! Make sure the gas co
Finalizing the Installation (for qualified installers only) 23Travis Industries 100-01169_001 40501196 Let the heater burn for thirty minutes. Adjus
24Finalizing the Installation (for qualified installers only)Travis Industries 100-01169_001 4050119Glass Removal! Make sure the gas control valve is
Finalizing the Installation (for qualified installers only) 25Travis Industries 100-01169_001 4050119Glass Frame Removal and Installation (continued)
26Finalizing the Installation (for qualified installers only)Travis Industries 100-01169_001 4050119Log Installation! Make sure the gas control valve
Finalizing the Installation (for qualified installers only) 27Travis Industries 100-01169_001 4050119Log Installation (continued)Place the top twigs
28 OperationTravis Industries 100-01169_001 4050119Before You BeginWarning: Read this entire manual before you use your new stove (especially the sect
Operation 29Travis Industries 100-01169_001 4050119Starting The Pilot FlameThe pilot flame is required to ignite the main burners(it also plays a safe
Table of Contents 3Travis Industries 100-01169_001 4050119IntroductionIntroduction & Important Information...2Safety PrecautionsSafet
30 OperationTravis Industries 100-01169_001 4050119Starting the Stove for the First TimeFumes from the Painted Surfaces CuringBurn the heater at a med
Operation 31Travis Industries 100-01169_001 4050119Adjusting the Blower Speed (optional)The blower helps transfer heat from the heater into the room.
32 Maintenance (for qualified service personnel only) Travis Industries 100-01169_001 4050119Maintaining Your Stove's AppearanceWARNING : Ma
Maintenance (for qualified service personnel only) 33Travis Industries 100-01169_001 4050119Troubleshooting TableProblem: Possible Cause: Don't
34 Maintenance (for qualified service personnel only) Travis Industries 100-01169_001 4050119How this Stove Works! This stove was designed with saf
Maintenance (for qualified service personnel only) 35Travis Industries 100-01169_001 4050119Wiring DiagramCaution: Label all wires prior to disconne
36 Safety LabelTravis Industries 100-01169 4050119A copy of the safety (listing) label (adhered to the back of the stove) is shown below.A copy of the
Limited 7 Year Warranty 37Travis Industries 100-01169_001 4050119To register your TRAVIS INDUSTRIES, INC. 7 Year Warranty, complete the enclosed warra
38 Optional Equipment (for qualified installers only)Travis Industries 100-01169_001 4050119LP Conversion InstructionsInstall the conversion kit prio
Optional Equipment (for qualified installers only) 39Travis Industries 100-01169_001 40501193 Follow the directions below to replace the orifice.1/2&
4 Safety PrecautionsTravis Industries 100-01169_001 4050119• IF YOU SMELL GAS:* Do not light any appliance* Extinguish any open flame* Do not tou
40 Optional Equipment (for qualified installers only)Travis Industries 100-01169_001 40501195 Install the logs andembers.6 Replace glass andface.7 Re
Optional Equipment (for qualified installers only) 41Travis Industries 100-01169_001 4050119Blower (SKU 99000153)WARNING: Turn the gas control valve
42 Optional Equipment (for qualified installers only)Travis Industries 100-01169_001 40501193 Slide the left side of the blower mounting bracket over
Optional Equipment (for qualified installers only) 43Travis Industries 100-01169_001 4050119Accent Light (Type 2 – 94400111)Make sure power to the he
44 Optional Equipment (for qualified installers only)Travis Industries 100-01169_001 40501193 Attach the rheostat assembly following the directions b
Optional Equipment (for qualified installers only) 45Travis Industries 100-01169_001 4050119Accent Light OperationOFFTurn the dial all the way counte
46 IndexTravis Industries 100-01169_001 4050119Accent Light...43Adjusting the Blower Speed...
Safety Precautions 5Travis Industries 100-01169_001 4050119• Do not place clothing orother flammable items on ornear the heater. Becausethis heater c
6 SpecificationsTravis Industries 100-01169_001 4050119Features:- Ember Fyre™ Burner for "Wood Fire" Look- Works During Power Outages (milli
Installation (for qualified installers only) 7Travis Industries 100-01169_001 4050119Installation Warnings:! Failure to follow all of the requiremen
8 Installation (for qualified installers only)Travis Industries 100-01169_001 4050119Installation Hints:• If converting to LP, convert the applianc
Installation (for qualified installers only) 9Travis Industries 100-01169_001 4050119Heater Placement Requirements• Heater must be installed on a le
Kommentare zu diesen Handbüchern